Your first project, stage by stage.
You do not need to be a builder to manage a building project. You need to know what is happening, what to look at before it is hidden for good, and what to ask. This is the order a house is built in, in plain words.
It is general guidance that holds in most places. Local rules, permits and building codes differ, and it does not replace the architect, engineer or builder you hire.
- 1
Preparing the site
The team is clearing and preparing the site.
The plot is cleared, levelled and marked out so the building sits exactly where the plans say.
What to look at. Ask to see the building's corners marked out and check them against the plan. The site should be tidy and safe to walk on.
- 2
Foundations
The team is laying the foundation.
Trenches are dug and the base the whole house stands on is poured: footings, and the slab or walls up to ground level.
What to look at. Visit before the concrete is poured. You can see the steel bars and the depth of the trenches, and after the pour they are hidden for good.
- 3
Building the frame
The team is building the frame.
The walls, columns, beams and floors go up. This is the stage where the house takes its shape.
What to look at. Check that the rooms and openings match the plan. Ask what the walls are made of and whether it matches what you agreed.
- 4
Closing in the walls and roof
The team is closing in the walls and roof.
The roof goes on, with the outer walls, windows and doors, so the building is closed to the weather.
What to look at. Look at the roof covering and how the windows are fixed. Ask how the roof is protected from leaks at the edges.
- 5
Pipes, wiring and ducts
The team is running the pipes, wiring and ducts inside the walls.
Water pipes, drains, electrical wiring and any ducts are laid inside the walls and floors before they are closed up.
What to look at. This is the last time you can see them. Take photos of the pipes and wiring, and check that sockets and taps are where you want them.
- 6
Insulation
The team is insulating the building.
Insulation goes into the walls and roof to keep the house cooler or warmer and to save energy.
What to look at. Ask what material is used and how thick it is. Photograph it before the walls are covered.
- 7
Closing up the inside
The team is closing up the walls and ceilings inside.
Walls and ceilings are covered over, plastered or boarded, ready for finishing.
What to look at. Check the walls are flat and the corners are square. Mark any problem now; it is easier to fix before painting.
- 8
Finishes
The team is doing the finishes: plaster, paint and floors.
Floors, paint, tiles and fittings go in. This is the part you will notice most.
What to look at. Walk through each room with the list of what was agreed. Note anything that is chipped, uneven or different from what you chose.
- 9
The last details
The team is fitting the last details and tidying the site.
Doors, handles, switches, taps and fixtures are fitted, the site is cleaned, and the building is made ready to hand over.
What to look at. Test every door, tap, switch and window. Write down what needs fixing; it goes on the handover list.
What to ask a builder before you agree a price.
Each question comes with what a good answer sounds like. Ask for the answers in writing.
What the price covers
Is this a fixed price, or an estimate that can move?
Listen for: A fixed price should name what is in it. If it is an estimate, ask what would make it go up, and by how much.
What does the price include, and what does it leave out?
Listen for: Materials, labour, clean-up, permits, utility connections. A price that is far below the others has often left things out, and they come back later as extras.
Which items have an allowance, because they are not chosen yet?
Listen for: Allowances for tiles, fittings or appliances are normal. A low allowance means you pay the difference once you choose.
Changes and problems
How is a change priced and agreed?
Listen for: In writing, with the price and the effect on time agreed before the work is done, and signed by both of you. Changes agreed by word of mouth are where most disputes start.
What happens if a problem turns up once work has started, such as poor ground or hidden damage?
Listen for: They should say who pays, and how fast they will tell you. Vague answers here are a warning.
Payment
How much is paid before work starts, and when are the later payments?
Listen for: Payments tied to finished stages, not to dates. Be careful of a large payment up front, and ask how your money is protected if work stops.
People and proof
Who will do the work, and who will be on site day to day?
Listen for: Their own crew or hired trades, and a named person in charge on site. Ask how often that person is there.
Can I speak to two recent clients with similar work?
Listen for: Ask those clients about time, quality, and how problems were handled, not only whether they were happy.
What licence or registration and what insurance do you hold?
Listen for: Ask to see current documents, and check them yourself. Hearing it is not enough.
Time, and afterwards
When could you start, how long will it take, and what could delay it?
Listen for: A start date and an end date, plus what you must provide on time, such as decisions and access to the site.
What do you guarantee after handover, and who do I call?
Listen for: How long it lasts and what it covers, in writing, with a name and a number.
Want a number to hold their price against? Get your quick price, free and with no account.
Know the number before you build it.
Start with a quick price, free. Then Redline helps you ask builders properly and check what comes back.